Hard Seltzer Brewery Expansion
Scope – Detailed Engineering Design and Specification implementing a new Hard Seltzer production plant within an existing major brewery:
- Liquid Sugar intake, storage dilution and blending, feeding into existing fermentation
- Modifications to existing beer storage tanks for fermented and filtered alcohol base and other bulk ingredients
- Blending of base with bulk ingredients, multiple flavour dosing, chilling and carbonation of Seltzer
- Interface with existing packaging lines, including new dedicated surge tanks
We are also working on the same site on an EPC (Turnkey) project including integration of new and upgraded malt handling, brewhouse additions, yeast, unitank & dry hopping systems, into the existing plant.
Offering the Hard Seltzer Industry
- Concept Studies / Front-End Loading (FEL 1-3)
- Detailed Design
- Specialist Equipment Design and Manufacture
- Leading Hard Seltzer Technologies
- Process Engineering
- Project Management
- Functional Safety and Hazardous Area Design
- Automation and Control